Analisis Pelaksanaan Pembangunan Jembatan Layang Proyek Pembangunan Jalan Tol Yogyakarta – Bawen, Paket 1 (Seksi 1) Elevated 4

Lintang Dwi Sakti, Muhammad Bagus Sajiwo, Dhamang Budi Cahyono, Hari Setijo Pudjihardjo, Fitria Maya Lestari

Abstract


The implementation of construction projects must be carried out thoroughly starting from planning, implementation to maintenance. In the implementation of construction projects, of course, there are various problems that arise, with this implementation problem the parties involved in the construction project must complete the project on time, quality and cost. This study aims to identify the implementation problem factors and actions taken or solutions to the implementation problems that occur in the Elevated bridge construction project, Yogyakarta - Bawen Toll Road. This research is a type of descriptive research, and for data collection researchers provide questionnaires to sources and make observations in the field to find the beginning of the implementation problem. This study shows the results that good team coordination, the use of personal protective equipment (PPE), poor communication between teams in the organisation, the effective supervision system in the field of project implementation, and the effective project risk evaluation system in identifying, evaluating, and managing risks arising during the implementation of bridge laying construction are problem factors that affect implementation, while making detailed planning designs, ensuring all parties understand their roles and responsibilities, improving the quality and timeliness of completion.

Keywords


Construction; Project; Elevated; Planning

Full Text:

PDF

References


Afiq, M., & Nurdiana, A. (2024). Analisis Manajemen Risiko Pada Pelaksanaan Pembangunan Bangunan Hijau Di Kota Semarang. Syntax Admiration, 5(6), 2322-2329.

Akbar, M. M., Anggara, R. D., Wibowo, K., & Adhy, D. S. (2020). Analisis Pelaksanaan Keamanan dan Keselamatan Kerja (K3) Dengan Metode Job Safety Analysis (JSA) Proyek Pembangunan Jembatan SiKatak Unversitas Diponegoro Semarang. PROSIDING KONFERENSI ILMIAH MAHASISWA UNISSULA (KIMU) 4 (hal. 277-284). Semarang: Universitas Islam Sultan Agung.

Djaelani, M., & Retnowati, E. (2023). PENGARUH PENGAWASAN KERJA DAN PENERAPAN PROGRAM KESELAMATAN DAN KESEHATAN KERJA TERHADAP PRODUKTIVITAS PEKERJA PROYEK KONSTRUKSI. Jurnal Satyagraha, 5(2), 32-38.

Gusmão de Oliveira, E. M., Poernomo, I., & Sahadi. (2023). PENGARUH KOORDINASI KINERJA TERHADAP KEBERHASILAN PROYEK KONSTRUKSI DI JAWA TENGAH DAN DAERAH ISTIMEWA YOGYAKARTA. JURNAL ILMIAH TEKNIK SIPIL, 27(1), 91-99.

Gusta, S. K., Nurhidayati, Z. A., & Widuri, I. L. (2023). TUGAS AKHIR: EVALUASI PENGGUNAAN BIM 360 DOCS DALAM IMPLEMENTASI COMMON DATA ENVIRONMENT PROYEK JALAN TOL YOGYAKARTA – BAWEN PAKET 1 (SEKSI 1). Semarang: PROGRAM STUDI TEKNOLOGI KONSTRUKSI JALAN DAN JEMBATAN POLITEKNIK PEKERJAAN UMUM.

M. Kasim M, Habibi, M., & Veronika, E. (2018). STUDI TENTANG SARANA DAN PRASARANA INFRASTRUKTUR DALAM PEMBANGUNAN MASYARAKAT PERBATASAN DI DESA LIANG TURAN KECAMATAN KRAYAN BARAT KABUPATEN NUNUKAN. FisiPublik: Jurnal Ilmu Sosial dan Politik, 3(1), 34-42.

Mulyawan, H., Waryanto, A., & Lusiana, E. (2001). Tesis: Pengaruh kualitas pengawasan terhadap kinerja proyek pada tahap pelaksanaan konstruksi bangunan industri di Indonesia. Kota Depok: Prodi Teknik Sipil, Universitas Indonesia.

Pemerintah Indonesia. (2022). Undang-undang (UU) Nomor 2 Tahun 2022 tentang Perubahan Kedua atas Undang-Undang Nomor 38 Tahun 2004 tentang Jalan. Jakarta: Lembaran Negara Republik Indonesia Tahun 2022 No. 12.

Peraturan Pemerintah. (2021). Peraturan Pemerintah (PP) Nomor 14 Tahun 2021 tentang Perubahan atas Peraturan Pemerintah Nomor 22 Tahun 2020 tentang Peraturan Pelaksanaan Undang-Undang Nomor 2 Tahun 2017 Tentang Jasa Konstruksi. Jakarta: Lembaran Republik Indonesia tahun 2021 No. 24.

Putra, I. W., Dewi, A. D., & Sudarsana, D. K. (2021). EVALUASI RISIKO PROYEK PEMBANGUNAN GEDUNG RSIA PURI BUNDA TABANAN – BALI. Jurnal Spektran, 9(2), 124-132.

Rizal, A. H., Agon, Y. U., & Bella, R. A. (2023). FAKTOR-FAKTOR PENGHAMBAT YANG BERPENGARUH TERHADAP KINERJA WAKTU PELAKSANAAN PROYEK PEMBANGUNAN GEDUNG. Jurnal Teknik Sipil, 12(1), 99-112.

Tutuko, B., Pudjiharjo, H. S., Nugroho, B. J., & Santosa, T. B. (2022). ALISIS SISTEM MANAJEMEN PENGENDALIAN MUTU DALAM MENINGKATKAN KINERJA WAKTU PROSES KONSTRUKSI BANGUNAN GEDUNG TINGGI DI KOTA SURABAYA. Journal of Civil Engineering and Technology Sciences, 1(2), 56-68.

Wijoyo, A., Kunaefi, A., Kurniawan, D., Zainudin, M., Gustamal, M. A., & Sulistiana, O. (2024). Fungsi Organisasi Pada Manajemen Proyek. OKTAL : Jurnal Ilmu Komputer dan Science, 3(2), 537-541.

Winarsih, N., Nisah, F. A., Halimah, S., & Adikirana, N. A. (2023). PEMILIHAN MATERIAL KONTSRUKSI BANGUNAN PERUMAHAN MENGGUNAKAN METODE ANALISIS HIERARKI PROSES. JURNAL DISPROTEK, 14(2), 129-138.

Wirabakti, D. M., Abdullah, R., & Maddeppungeng, A. (2014). STUDI FAKTOR-FAKTOR PENYEBAB KETERLAMBATAN PROYEK KONSTRUKSI BANGUNAN GEDUNG. Jurnal Konstruksia, 6(1), 15-29.




DOI: http://dx.doi.org/10.26623/ijces.v1i1.9666

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Indonesian Journal of Civil Engineering Study

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

IJCES is published by the Department of Civil Engineering, Faculty of Engineering, Universitas Semarang.