Analisis Pelaksanaan Pembangunan Rumah Tinggal 4 Lantai di Graha Padma Semarang

Nico Hilman Fradita, Hendri Andika Putra, Hari Setijo Pudjihardjo, Faizal Mahmud, Iryan Dwi Handayani

Abstract


Over time construction development in Indonesia has experienced very rapid development. The purpose of construction planning is to meet project specifications which include, quality and time coupled with the realization of work safety. The purpose of this study is to find out what factors occur during the implementation and the actions taken from solving the most effective problems during the implementation of the construction of a 4-storey residential house in Graha Padma. The data collection method in this study uses questionnaires distributed to resource persons and surveys in the field to find the beginning of implementation problems. Based on the results of the research conducted, the results of the research were obtained, namely the evaluation process that was not carried out during the planning of the project implementation, including the factors that affect the implementation. Meanwhile, making a new project schedule by considering the risk factors and obstacles faced is an action taken in overcoming implementation problems.

Keywords


Construction; Implementation; Project Management

Full Text:

PDF

References


Arliana, A., & Nugroho, A. (2021). Konsep Open-plan pada Rumah Tinggal: Studi Kasus, Rumah di Gg. Ramdhan II 128/47, Bandung. Waca Cipta Ruang, 7(2), 51-57.

Budiyanto, 2018. Analisa Faktor-Faktor Penyebab Keterlambatan Proyek Pembangunan. UIB Repository.

Chasanah, U., dan Sulistyowati, S. (2017). Penerapan Manajemen Konstruksi dalam Pelaksanaan Konstruksi. Neo Teknika, 3(1).

Cicia, V. (2023). Analisis Kendala Penerapan Sistem Manajemen Waktu Pada Proyek Konstruksi (Studi Kasus: Proyek Pembangunan Gedung B Kapal Api Office Gambir) (Doctoral dissertation, Institut Teknologi Indonesia).

Deden, M. R. (2014). Studi Faktor - Faktor Penyebab Keterlambatan Proyek Konstruksi Bangunan. Jurnal Konstruksia, 16 (1), 15-29.

Falasifadin, A., Wibowo, D. S., & Pudjihardjo, H. S. (2017). Analisis Sistem Kerja Manajemen Konstruksi Dalam Proyek Pembangunan Gedung Poltekkes 5 Lantai Di Tembalang. Teknika, 12(2).

Ningrum, T. P. (2018). Kajian Perubahan Fungsi Rumah Tinggal Menjadi Rumah Kos di Sekitar Kampus Universitas Muhammadiyah Purwokerto (Doctoral dissertation, Universitas Muhammadiyah Purwokerto).

Permana, I., & Sumarman. (2017). Perencanaan Manajemen Proyek Pembangunan Rumah Susun Lajang 3 Lantai Pondok Pesantren Assalafiyah Kabupaten Brebes. Jurnal Konstruksi, VI (1), 47-58.

Pudjihardjo, H. S., Anggraini, L., Anggraeni, D. P., & Putera, J. U. (2021). Analisis Faktor-Faktor Yang Mempengaruhi Pelaksanaan Pembangunan Gedung Di Kota Semarang. Jurnal Teknik Sipil, 14(2), 38-49.

Rita, E., Carlo, M., Nandi. (2021). Penyebab dan Dampak Keterlambatan Pekerjaan Jalan di Sumatera Barat Indonesia. Jurnal Rekayasa, 11(1), 27-37.

Simbolon, H., & Nasution, I. N. (2017). Desain Rumah Tinggal yang Ramah Lingkungan untuk Iklim Tropis. Jurnal Education Building, 3(1), 46-59.

Sudarwanto, B. (2011). Rekayasa Membangun Rumah Tinggal (Kajian Pengalaman Empirik). Modul, 11(1). 29-36.

Tama, A.K., Anggraini, L.,Tutuko B. (2020). Analisis Kinerja Manajemen Konstruksi Pada Proyek Gedung Digitasi Universitas Negeri Semarang. Jurnal Teknik Sipil.

Undang-Undang Republik Indonesia Nomor 1 Tahun 2011 tentang Perumahan dan Kawasan Permukiman.

Wibowo, P., & Rozy, N. (2020). Analisis Manajemen Konstruksi Pembangunan Gedung Rawat Inap Kelas Iii Rsud Waled Kabupaten Cirebon. Jurnal Konstruksi dan Infrastruktur: Teknik Sipil dan Perencanaan, 9(2).




DOI: http://dx.doi.org/10.26623/ijces.v1i2.10257

Refbacks

  • There are currently no refbacks.


Copyright (c) 2025 Indonesian Journal of Civil Engineering Study

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

IJCES is published by the Department of Civil Engineering, Faculty of Engineering, Universitas Semarang.