Analisa Perencanaan Pembangkit Listrik Tenaga Surya Atap dengan Sistem Hybrid di PT. Koloni Timur

Noor Hajir Sudarjo, Muhamad Haddin, Agus Suprajitno

Abstract


This study discusses the Planning of a Rooftop Solar Power Plant with a Hybrid System at PT East Colony Kudus. The
model is set as a PLTS whose solar panels are adjusted to the roof area of the building. This PLTS is functioned as a new
renewable energy resource (EBT) in the form of a hybrid between PLTS and PLN's electrical energy source, this is done to
help supply electricity. Parameters determined include: roof area, solar panel capacity, inverter capacity, battery capacity
and payback period. The results show that PLTS with a total of 80 solar panels installed with a capacity of each panel 405
Watt peak, then obtained a power capacity of 32.4 kilo Watt peak which is divided into 5 arrays, with a solar charger controller
and inverter using a 10kW capacity of 5 units, 80 batteries with a capacity of 400Ah. So that PLTS is able to contribute 39.3%
of the total power needed by PT East Colony (electric power from PLN is 60.7%). This hybrid payback period will return after
8 years and 7 months.


Keywords


PLTS, Hybrid, PT East Colony

Full Text:

PDF

References


C. S. Iskandar and N. Latief, Sistem Listrik Tenaga Surya

DIsain,dan Operasi Instalasi. Sleman: CV. BUDI

UTOMO, 2018.

E. Tarigan and F. D. Kartikasari, Analisis Potensi Atap

Bangunan Kampus Sebagai Lokasi Penempatan Panel

Surya Sebagai Sumber Listrik, Teknologi, p. 110, 2017.

Sigit Sukmajati and M. Hafidz, Perancangan Dan

Analisis Pembangkit istrik Tenaga Surya Kapasitas 10

MW On Grid Di Yogyakarta, Teknologi, pp. 56 57,

G. A. Sinaga, Analisis Pembangkit Listrik Sistem

Hybrid Grid Connected Di Villa Peruna Saba, Gianyar

Bali, Teknologi, vol. 6, p. 6, 2019.

T. S. Mehang, M. Santoso, and Y. Tanoto, Studi

perencanaan pembangkit listrik tenaga surya (PLTS) Di

kecamatan Ngadu Ngala, Kabupaten sumba Timur,NTT,

Teknologi, vol. 10, p. 1, 2017.

B. . M. S. ing. Ramadhani, Instalasi Pembangkit Listrik

Tenaga Surya Dos & Don ts. Jakarta: Deutsche

Gesellschaft Fur Internationale Zusammenarbeit(GIZ)

Gmbh, 2018.

S. N. Hutagalung and M. Panjaitan, PROTYPE

RANGKAIAN INVERTER DC KE AC 900 WATT,

Jurnal Pelita Informatika, vol. 6, no. 1, p. 64, 2017.

R. Pambudi, Analisa Perencanaan Pembangkit Listrik

Tenaga Surya Di Atap Gedung Aquarium & Gedung

pertemuan Wisata Bahari Pekalongan, Semarang,

Skripsi Program Studi Teknik Elektro Universitas Islam

Sultan Agung Semarang, 2018, [Online]. Available:

PLTS, Panel surya, IRR, Energi alternatif.

C. F. K. Sari, PENGARUH ANALISIS INVESTASI

TERHADAP KELAYAKAN PENAMBANGAN BATU

MANGAN DI PT. BERKAT ESA MINING, jurnal

Science Tech, vol. 4, p. 14, 2018.




DOI: http://dx.doi.org/10.26623/elektrika.v14i1.3784

Refbacks

  • There are currently no refbacks.


Office: Electrical Engineering Lecturer Room, 7th Floor of Menara USM Building, Universitas Semarang, Jalan Soekarno - Hatta, Tlogosari, Semarang - Central Java Tel:(024) 6702757 Fax: (024) 6702272, Email: elektrika@usm.ac.id

View My Stats

Creative Commons License
This work is licensed under a  Creative Commons Attribution 4.0 International License.