Evaluasi Critical Success Factors terhadap Keberhasilan Proyek Konstruksi menggunakan Metode Analytical Hierarchy Process (Studi Kasus: Proyek Gedung IME UNSOED)
DOI:
https://doi.org/10.26623/ijces.v3i1.13845Keywords:
Analytical Hierarchy Process, Cost Overruns, Early Risk Identification, Quality Aspect, User SatisfactionAbstract
Construction building projects play an important role in supporting infrastructure development; however, their implementation often faces delays, cost overruns, and quality deterioration. Therefore, a comprehensive evaluation of the factors influencing project success is required. Critical Success Factors (CSFs) are key factors conditions, characteristics, or variables that directly affect a project’s success because they determine what must be managed effectively to achieve project objectives. This study was conducted through interviews and questionnaire surveys administered to project stakeholders. The data were analyzed using the Analytical Hierarchy Process (AHP) to obtain priority weights for each aspect and factor. The results identify seven aspects and twenty-three factors that influence the success of the Integrated Medical Education (IME) Building Project at UNSOED. The quality aspect has the highest priority, with a weight of 0.192. The five most dominant factors are the effectiveness of schedule control and monitoring (0.0744), early risk identification (0.0684), the quality control system and quality documentation (0.0681), compliance with technical quality standards (0.0644), and the level of user satisfaction (0.0593). These findings indicate that the dominant factors should receive primary attention in project management particularly those related to quality, time, and risk management in order to improve overall project success.
References
Arifin, Z., Anggraeni, L., & Latifah, E. (2022). Potato Farming Management in Sloping Upland. In Current Topics in Agricultural Sciences Vol. 8 (pp. 87–93). Book Publisher International (a part of SCIENCEDOMAIN International). https://doi.org/10.9734/bpi/ctas/v8/16016D
Faqih, N., Qomaruddin, M., & Wulandari, D. A. (2025). 輪廓線與垂直輪廓線種植模式對馬鈴薯及紅蔥頭 農地水土流失之抑制效果比較. 37(3), 173–179.
Faqih, N., Suripin, S., Wulandari, D. A., & Qomaruddin, M. (2025). Optimizing Annual Cropping Patterns Using A multi-objective Approach to Maximize Income and Minimize Soil Erosion. International Journal of Engineering, Science and Information Technology, 5(3), 132–137. https://doi.org/10.52088/ijesty.v5i3.923
Jamal. (2021). Analisis Success Factor Manajemen Sistem Swakelola pada Proyek Bangunan Gedung. Universitas Islam Indonesia.
Johari, G. J., & Amarulloh, S. (2021). Analisa Faktor Keberhasilan Proyek Kontruksi di Kabupaten Garut. Jurnal Konstruksi, 19(2).
Lendra, L., Sintani, L., Salonten, S., Robby, R., & ... (2025). Optimalisasi Manajemen Nilai Hasil untuk Pengendalian Waktu dan Biaya: Studi Kasus Proyek Drainase. In Journal of Economic …. ojs.unsiq.ac.id. https://ojs.unsiq.ac.id/index.php/jematech/article/view/6963
Nurcahaya. (2023). Analisis Regresi dan Korelasi dalam Pemodelan Transportasi Berbasis Survei. Jurnal Transportasi Dan Infrastruktur, 5(2), 45–54.
Pinto, J. K., & Slevin, D. P. (1987). Critical Factors in Successful Project Implementation. IEEE Transactions on Engineering Management, 34(1), 22–27.
Pratama, A. P. (2023). Faktor-Faktor Yang Berpengaruh Terhadap Keberhasilan Proyek Pembangunan Underpass Bulak Kapal. Sistem Infrastruktur Teknik Sipil, 3(1).
Silalahi, Y. I., Masthura, L., & Fahriana, N. (2023). Analisis Faktor - Faktor Penentu Keberhasilan Proyek Konstruksi Berdasarkan Mutu, Biaya dan Waktu. Jurnal Ilmu-Ilmu Teknik Sipil, 7(2), 233–240.
Subhan, M. (2007). Kriteria Keberhasilan Proyek.
Suyono, N. A., & Faqih, N. (2019). Optimalisasi Produk Kewirausahaan Dasawisma di Desa Kalibeber, Kecamatan Mojotengah, Kabupaten Wonosobo, Jawa Tengah. dspace.uii.ac.id. https://dspace.uii.ac.id/handle/123456789/17331
Syaifullah. (2010). Pengenalan Metode AHP (Analytical Hierarchy Process). https://syaifullah08.wordpress.com
Tamin, O. Z. (2000). Perencanaan dan Pemodelan Transportasi (Edisi Kedu). Penerbit ITB.
Willumsen, P. L, Oehmen, J., Stingl, V., and Geraldi, J. (2019). Value creation through project risk management. Int. J. Proj. Manag.37 (5), 731–749. 10.1016/j.ijproman.2019.01.007
Zachawerus, J., Soekiman, A., & al., et. (2018). Faktor-Faktor Yang Mempengaruhi Kesuksesan Pelaksanaan Proyek Jalan Nasional di Maluku Utara. Jurnal Infrastruktur, 4(1).
Downloads
Published
Issue
Section
License
Copyright (c) 2026 Indonesian Journal of Civil Engineering Study

This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.
This work is licensed under a Creative Commons Attribution 4.0 International License.