Analisa Perhitungan Nilai Kapsitor Bank untuk Perbaikan Faktor Daya pada PT. Karya Toha Putra
DOI:
https://doi.org/10.26623/elektrika.v12i1.2148Keywords:
Electric power quality, Power Factor, Bank CapacitorsAbstract
The use of electricity with large capacity sometimes faces various kinds of problems. These problems include network losses and voltage drops that occur in the channel. Improvement of electric power factor at PT. Karya Toha Putra is expected to improve the quality of electric power. This improvement is also expected to reduce the cost of electricity bills at PT. Karya Toha Putra. To be able to implement improvements in the quality of the electric power, it is necessary to calculate the reactive power compensated. In this case the power factor to be achieved is 0.95. After doing these calculations, the determination of the capacitor value will be used. By doing these stages, it is expected that the installation of capacitor banks can improve the quality of electric power. Bank capacitors are collections of capacitors used to provide reactive power compensation to improve the electrical power factor. From the results of the study showed that the amount of compensation needed to improve the power factor at PT. Karya Toha Putra is 50 kVAR, divided into 5 steps with one step, a capacitor of 10 kVAR.
Downloads
References
R. P. Syawal, Analisis Pengaruh Pemasangan Kapasitor Bank Terhadap Faktor Daya (Studi Kasus Gardu Distribusi Fakultas Teknik Universitas Halu Oleo), 2015.
S. Bandri and T. Danial, Studi Analisa Pemasangan Kapasitor Pada Jaringan Udara Tegangan Menengah 20 KV Terhadap Drop Tegangan (Aplikasi Pada Feeder 7 Pinang GI Muoro Bungo), Tek. Mesin, vol. 4, no. 1, 2014.
P. A. Taufik, Studi Penempatan Kapasitor Untuk Perbaikan Kualitas Tegangan Di Penyulang Kangkung Gi Manggala, 2016.
A. Rochim, Perbaikan Faktor Daya Listrik Dengan Kapasitor Bank Di Greeting Stone Loundry, Universitas Islam Sultan Agung Semarang, 2015.
Nurwolo Agus, "Rancang Bangun Kapasitor Bank Pada Jaringan Listrik Gedung Universitas PGRI Semarang," ISBN 978-60299334-4-4. 2015.
Yani Ahmad, "Pemasangan Kapasitor Bank Untuk Perbaikan Faktor Daya". Journal of Electrical Technology, Vol. 2, No. 3, 2017.
Tampubolon David, Optimalisasi Penggunaan Kapasitor Bank Pada Jaringan 20 KV Dengan Simulasi ETAP . Vol. 9, No. 2, 2014.
M. F. Hakim, Analisis Kebutuhan Capsitor Bank Beserta Implementasinya Untuk Memperbaiki Faktor Daya Listrik Di Politeknik Kota Malang . Jurnal ELTEK , Vol 12, No. 1 2014.
Downloads
Published
Issue
Section
License
Authors who publish this journal agree to the following terms:
The author owns the copyright and grants the journal the first publication rights with the work simultaneously licensed under the Creative Commons Attribution 4.0 International License which allows others to share the work with recognition of the authorship of the work and initial publication in the journal.
Authors may enter into separate additional contractual agreements for non-exclusive distribution of the published journal version of the work (e.g., posting it to an institutional repository or publishing it in a book), in recognition of its initial publication in this journal.
Authors are allowed and encouraged to post their work online (e.g., in institutional repositories or on their websites) before and during the submission process, as it can lead to productive exchanges, as well as earlier and larger citations of published works (See The Effects of Open Access).
This work is licensed under the Creative Commons Attribution 4.0 International License.