Pelatihan MS Project pada Siswa-Siswi SMK Sakti Gemolong

Diah Rahmawati, Sutarno Sutarno, Galih Widyarini, Purwanto Purwanto

Abstract


Vocational High School (SMK) graduates are prepared to be able to compete in the world of work. To be able to compete, vocational school graduates are expected to have hard skills and soft skills. Likewise, Sakti Gemolong Vocational School tries to provide skills to its students through training. The problem is that to fulfill this, SMK Sakti Gemolong must collaborate with other agencies. Seeing this, the Community Service Team tried to help by providing MS Project training. The aim is to increase knowledge and skills in using project scheduling software. The target is students of Class XI Sakti Gemolong Vocational School, Department of Construction and Property Business (BKP) in Sragen. Activities are carried out in two stages, namely problem identification (preliminary survey to find out the curriculum and competencies), problem-solving approach (using presentation techniques as a lecture method, demonstration and direct practice on the computer as well as evaluation to find out the level of absorption of the material). In carrying out Community Service activities, before training a pre-test is carried out. The results obtained were that 95% of students did not understand how to use MS Project software. Meanwhile, after training, a post-test is carried out. The result was that 91% of students understood how to use MS Project software. From the evaluation results, it shows that there has been an increase in understanding and skills by 86%.


Keywords


training; MS Project; scheduling

Full Text:

PDF

References


Febriana, W., & Aziz, U. A. (2021). Analisis Penjadwalan Proyek Dengan Metode PERT Menggunakan Microsoft Project 2016. Surya Beton: Jurnal Ilmu Teknik Sipil, 5(1), 37-45.

Irwanto. (2015). Studi Komparasi Sekolah Menengah Kejuruan yang Efektif di Daerah Istimewa Yogyakarta. PETIK: Jurnal Pendidikan Teknologi Informasi Dan Komunikasi, 1(1), 52-67.

Oakland, J. S., & Marosszeky, M. (2017). Total construction management: Lean quality in construction project delivery. Taylor & Francis.

Sholeh, M. N., Suwarto, F., Dharmo, B., & Hartono, H. (2021). Pelatihan Pengenalan Microsoft Project 2019 pada Kontraktor dan Konsultan Bersama Himpunan Pengembangan Jalan Indonesia (HPJI) Jawa Tengah. Jurnal Pasopati, 3(2).

Undang-Undang Republik Indonesia Nomor 12 Tahun 2012 tentang Pendidikan Tinggi. (t.thn.).

Wahono, W. (2014). Kualitas pembelajaran siswa SMK ditinjau dari fasilitas belajar. Jurnal Ilmiah Guru Caraka Olah Pikir Edukatif, (1).

Wirabakti, D. M., Abdullah, R., & Maddeppungeng, A. (2017). Studi Faktor-Faktor Penyebab Keterlambatan Proyek Konstruksi Bangunan Gedung. Konstruksia, 6(1).

Zamtinah, Z., Kurniawan, U., Sarosa, D., & Tyasari, R. (2011). Model Pendidikan Karakter Untuk Sekolah Menengah Kejuruan. Jurnal Pendidikan Karakter, (1), 121115.




DOI: http://dx.doi.org/10.26623/jpk.v2i1.7312

Refbacks

  • There are currently no refbacks.


Copyright (c) 2024 Jurnal Pengabdian KOLABORATIF

Creative Commons License
This work is licensed under a Creative Commons Attribution-NonCommercial 4.0 International License.

Jurnal Pengabdian KOLABORATIF  is published by the Faculty of Engineering, Universitas Semarang.

View My Stats