EVALUASI INSTALASI LISTRIK PADA GEDUNG MULTI CENTRE OF EXCELLENT (MCE) RUMAH SAKIT ISLAM SULTAN AGUNG SEMARANG
DOI:
https://doi.org/10.26623/elektrika.v9i1.1110Keywords:
Evaluation of Electrical Installation, PUIL 2000, Ecodial Advance Calculation 4Abstract
MCE Building Sultan Agung Islamic Hospital Semarang is a public facility that requires an electrical installation system that is in accordance with PUIL 2000. The purpose of evaluating electrical installations at the Multi Center of Excellent (MCE) building in Sultan Agung Semarang Islamic Hospital is to find out electrical installations in accordance with PUIL 2000 Evaluation of electrical installations includes calculation of MCB security and calculation of cable size. Calculation using manual calculation method and calculation using Ecodial Calculation 4.7 software. The calculation results are then compared to the installed units. From the results of the comparison it can be seen whether the electrical installation is in accordance with PUIL 2000. The results of the analysis can be concluded that the electrical installation system in the MCE building of Sultan Agung Semarang Islamic Hospital is in good condition and safe. In MCB installed units, they are in accordance with the PUIL 2000 standard. In the cable sizes installed several are in a condition not in accordance with the PUIL 2000 standard so cable replacement is required. For example, on the 1st floor divider panel SDP cable where the installed cable is 4x35 mm2, it is replaced by 4x95 mm2.
Keywords: Evaluation of Electrical Installation, PUIL 2000, Ecodial Advance Calculation 4
Downloads
References
Merlin Gerin, Arus Hubung Pendek,PT. Schneider Ometraco, 1997. Persyaratan Umum Instalasi Listrik 2000. Jakarta : Badan Standarisasi Nasional PUIL 2000 Setiawan E, P.Van Harten, Instalasi Listrik Arus Kuat 1, Jakarta: Binacipta, 1986 Setiawan E, P.Van Harten, Instalasi Listrik Arus Kuat 3, Jakarta: Binacipta, 1989 Suhardi, Bambang, dkk, Teknik Distribusi Tenaga Listrik Jilid 1, Jakarta : Direktorat Pembinaan Sekolah Menengah Kejuruan, 2008 http://www.schneider-electric.com
Downloads
Published
Issue
Section
License
Authors who publish this journal agree to the following terms:
The author owns the copyright and grants the journal the first publication rights with the work simultaneously licensed under the Creative Commons Attribution 4.0 International License which allows others to share the work with recognition of the authorship of the work and initial publication in the journal.
Authors may enter into separate additional contractual agreements for non-exclusive distribution of the published journal version of the work (e.g., posting it to an institutional repository or publishing it in a book), in recognition of its initial publication in this journal.
Authors are allowed and encouraged to post their work online (e.g., in institutional repositories or on their websites) before and during the submission process, as it can lead to productive exchanges, as well as earlier and larger citations of published works (See The Effects of Open Access).
This work is licensed under the Creative Commons Attribution 4.0 International License.