[1]
Y. A. Sucahyo, Anton Soekiman, dan Chandra Afriade Siregar, “EVALUASI PENEKANAN WAKTU PELAKSANAAN PEKERJAAN STRUKTUR PADA PEMBANGUNAN INTERCHANGE DARANGDAN RAMP 1 DAN RAMP 4 PADA RUAS JALAN TOL CIPULARANG TAHUN 2023”, teknika, vol. 20, no. 2, hlm. 159–167, Nov 2025, doi: 10.26623/teknika.v20i2.11955.