Quality Control of Community-Empowerment-Based Concrete Road Construction in PNPM Mandiri Perdesaan (Case Study: Gajah Subdistrict, Demak) 18 17

Authors

DOI:

https://doi.org/10.26623/teknika.v21i2.14714

Keywords:

quality control, construction, community empowerment, PNPM, healthy, safety and environmental (HSE), concrete road infrastructure

Abstract

Damage to concrete road infrastructure, including surface cracking, layer peeling, and structural subsidence following the implementation of the PNPM Mandiri Perdesaan programme, indicates suboptimal quality control in community-based construction practices. This study aims to identify factors influencing construction quality, determine the most dominant factor, and formulate quality control recommendations suitable for community-managed (swakelola) projects. A quantitative descriptive approach was employed, with data collected through questionnaires distributed to 80 respondents in Gajah District, Demak Regency. The data were analysed using multiple linear regression with SPSS v.21. The results indicate that labour, funding, materials, work methods, and time have a statistically significant effect on construction quality (p < 0.05), while equipment has no significant effect. The model yields F = 37,786 and R2 = 0,756. The work method variable is identified as the most dominant factor (26%), followed by funding (23%), time (21%), labour (16%), and materials (14%). Effective quality control in community-based construction requires strengthening human resource capacity, enhancing technical supervision, and ensuring consistent implementation of occupational health, safety, and environmental (K3L) standards, as well as standard operating procedures.

References

Asnudin, A. (2010). Pendekatan Partisipatif Dalam Pembangunan Proyek Infrastruktur Perdesaan di Indonesia. http://jurnal.untad.ac.id/jurnal/index.php/SMARTEK/article/view/628

Dipohusodo. I. (1996). Manajemen Proyek Konstruksi (Jilid I). Kansius.

Ervianto. W. I. (2023). Manajemen Proyek Konstruksi (Edisi Revisi). Penerbit Andi.

Ghozali, I. (2016). Aplikasi analisis multivariate dengan program IBM SPSS 23 (Edisi 8). Badan Penerbit Universitas Diponegoro.

Hardiyatmo, H. C., (2007). Pemeliharaan jalan raya. Gajah Mada University Press.

Kerzner, Harold., & Saladis, F. P. (2009). Project management workbook and PMP/CAPM exam study guide. J. Wiley & Sons.

Lesmana, M., 1✉, D., Syafrudi, A., & Andayani, K. (2023). Kajian Etika Profesi Insinyur Teknik Sipil pada Pembangunan Jalan Tol. INNOVATIVE: Journal Of Social Science Research, 3(3), 2807–6047. https://doi.org/10/21004/innovative.v3i3.2479

Malasyi, S., Rauzana, A., & Afifuddin, M. (2021). Analisis Faktor-Faktor Risiko Yang Mempengaruhi Mutu Pada Proyek Konstruksi Di Aceh Utara. Teras Jurnal : Jurnal Teknik Sipil, 11(1), 223–232. https://doi.org/10.29103/tj.v11i1.432

Manus, Marsaoly, & Hakim. (2022). Analisis Faktor Keterlambatan Pekerjaan Preservasi Jalan Weda-Sagea Berdasarkan Persepsi Stakeholder. Jurnal Rekayasa Konstruksi Mekanika Sipil (JRKMS), 5(1), 51–59. https://doi.org/10.54367/jrkms.v5i1.1709

Gambar-gambar Infrastruktur Baik dan Buruk, the word bank office Jakarta, 2005)

Pedoman Pembangunan Infrastruktur baik & Buruk Program Pengembangan Kecamatan tahun 2005.

Pedoman sederhana pembangunan Prasarana Jalan dan Jembatan untuk Pedesaan, Departemen Pekerjaan Umum. Badan penelitian dan Pengembangan pusat penelitian dan pengembangan jalan Edisi 2007.

Penjelasan IV, PTO Jenis dan proses pelaksanaan Bidang Kegiatan Bidang Sarana Prasarana Kegiatan Program Nasional Pemberdayaan Masyarakat Mandiri Pedesaan tahun 2008.

Petunjuk Teknis Operasional Program Nasional Masyarakat Mandiri Pedesaan Tahun 2014.

Poleng, Y.V.A., Teja, A.W., Calling, C. L. B., & Gon, K. (2024). Analisis faktor-faktor yang mempengaruhi Proyek Padat Karya Preservasi pada Ruas Jalan Nasional di Pulau Flores-NTT. Jurnal Teknik Sipil: Rancang Bangun, 10 (1), 72-81. https://ejournal.um-sorong.ac.id/index.php/rancangbangun

Rafki, D., Dwifitra Y. Jumas, & Heldi. (2024). Analisis Faktor yang Mempengaruhi Kinerja Pelaksanaan Proyek Terhadap Kualitas Konstruksi Jalan Nasional di Provinsi Sumatera Barat. Civil Engineering Collaboration, 1–6. https://doi.org/10.35134/jcivil.v9i2.72

Rahmat, A., Irwan, L., Sitti Hawa, & Sufrianto. (2022). Faktor-Faktor Yang Mempengaruhi Mutu Pelaksanaan Proyek Peningkatan Jalan Tedubara-Pising Kabupaten Bombana. Sultra Civil Engineering Journal (SCiEJ), 3 (1)(1), 32. https://doi.org/10.54297/sciej.v3i1.242

Rompas, A. N., Dundu, A. K. T., Malingkas, G. Y., Puprd, D., & Utara, P. S. (2021). Evaluasi Implementasi Sistem Manajemen Mutu Sesuai Sni Pada Proyek Pembangunan Jalan. In Jurnal Ilmiah Media Engineering (Vol. 11, Number 2). https://ejournal.unsrat.ac.id/index.php/jime/article/view/35246

Silalahi, Y. I., Masthura, L., & Fahriana, N. (2023). Analisis Faktor - Faktor Penentu Keberhasilan Proyek Konstruksi Berdasarkan Mutu, Biaya dan Waktu. Jurnal Komposit, 7(2), 233–240. https://doi.org/10.32832/komposit.v7i2.14240

Undang-undang Dasar 1945. Pasal 34 Ayat (2) dan (3).

Undang-undang No.1 Tahun 1970 tentang Keselamatan Kerja.

Undang-undang No. 11 Tahun 2014 tentang Keinsinyuran.

Undang-undang No.32 Tahun 2009 tentang Perlindungan dan Pengelolaan Lingkungan Hidup.

Wibisono & Musyafa. (2024). Pentingnya Penerapan Etika Profesi Teknik Sipil dalam Pengambilan Keputusan Resiko Keselamatan dan Kesehatan Kerja & Lingkungan (K3L). Jurnal Teknik Mesin, Industri, Elektro dan Informatika, 3(3), 279–290. https://doi.org/10.55606/jtmei.v3i3.4225

Published

2026-10-22

Issue

Section

Articles

How to Cite

Purwanti, H., & Hadi Yudariansyah. (2026). Quality Control of Community-Empowerment-Based Concrete Road Construction in PNPM Mandiri Perdesaan (Case Study: Gajah Subdistrict, Demak). Teknika, 21(2), 132-141. https://doi.org/10.26623/teknika.v21i2.14714