“Analisis Time-Cost Trade Off Pada Percepatan Struktur Dan Arsitektur, Dengan Metode Cast In Situ Dan Precast Terhadap Efisiensi Waktu Dan Biaya (Studi Kasus RSUD Dr.Loekmonohadi Kudus)”. Indonesian Journal of Civil Engineering Study 3, no. 2 (October 23, 2026): 46–60. Accessed November 2, 2026. https://journals.usm.ac.id/index.php/ijces/article/view/16143.